Heat recovery boiler converts the excess heat generated by the operation of the furnace charcoal kiln UP "EURO" in the heat. The boiler can also operate on natural gas and wood. Thermal power boiler for the 1st oven can reach 50kW.
The waste-heat boiler can be used for drying chambers, working, office and living areas, greenhouse complexes, etc. Moreover with the nowadays’ prices for raw material resources (gas, coal, heat energy, liquid fuel) this boiler will pay its way in 1-2 seasons and will make you independent from external sources of energy.
Technical characteristics of the installation
| The name of parameter |
Unit |
Value |
| Nominal heat power |
kW |
by 50 |
| Firewood consumption (given temperature of coolant is 60°C) |
m³/day |
1-2 |
| Area of heated spaces |
m² |
by 3500 |
| Overall dimensions, length × width × height |
mm |
1645×1630×1180 |
| Mass |
kg |
850 |
|